Site your next campus with power already secured
We match high-density AI workloads to sites where power, cooling and permitting have been assessed together. Tell us your requirement and we come back with what is actually available.
DISCUSS SITE REQUIREMENTSWhere we are focused
Three markets, three different power stories
Each market has its own power, permitting and delivery profile, and that is usually what decides a timeline. The sites published below sit inside these markets.
United States
Texas, Georgia — grid-adjacent, fastest energization
- Energy profile
- Grid-adjacent capacity with the shortest route to power
- Site capacity range
- 2–20 MW
Europe
Nordics, Iberia — hydro and wind, longer permitting
- Energy profile
- Hydro and wind, with longer permitting timelines
- Site capacity range
- 2–20 MW
United Arab Emirates
Abu Dhabi, Dubai — sovereign capacity, high density
- Energy profile
- Sovereign capacity built for high-density deployment
- Site capacity range
- 2–20 MW
Loading live site availability
From parcel to assessment in four steps
The request takes about five minutes and costs nothing. Nothing commits you to develop.
Share your site
Location, parcel size and whether a grid interconnection agreement is already in place.
Confirm power
Available megawatts, substation status and how long until power can actually be delivered.
Set the energy mix
Grid, renewable or hybrid supply, plus any PPA. This drives the ESG score and carbon figure.
Get your assessment
An ESG grade, estimated annual revenue and concrete next steps — at no cost, with no obligation.
Who this is for
Three different problems, one set of site data.
Find out what your parcel is worth
Before spending on feasibility consultants, get an indicative valuation based on power, land and energy profile.
- Assessment at no cost
- No development commitment
- Reply within one business day
De-risk site selection
Compare candidate sites on the criteria that actually gate a data centre: megawatts, lead time and cooling viability.
- Substation capacity data
- Energization timelines
- Cooling suitability
Move into a ready site
Skip greenfield entirely and take space at a location where power is already secured and energized.
- Sites in our priority markets
- Tier I–IV development
- Direct-to-chip cooling
Questions land owners ask
What does 'energization' mean?
The date power can actually be delivered to the site. It is the constraint that most often decides a data centre timeline, which is why it is listed on every site card.
Do I need a PPA already in place?
No. A Power Purchase Agreement improves your ESG score and reduces residual emissions, but the assessment works either way and will show you the difference.
What is a Core versus Expansion node?
Core nodes are fully energized and operating today. Expansion nodes are contracted and under construction. Edge nodes serve latency-sensitive workloads closer to users.
How is the ESG score calculated?
From your energy mix, PPA status and available capacity. The letter grade, carbon footprint in tCO2e per year and renewable ratio update live as you change inputs during the assessment.
Is the assessment binding?
No. It is a feasibility indication at no cost. Nothing commits you to develop, lease or sell.
Talk to the site team
Tell us about your parcel and we'll come back with an indicative view.
Find out what your land is worth
No cost, no obligation, and we reply within one business day.