Site your next campus with power already secured

We match high-density AI workloads to sites where power, cooling and permitting have been assessed together. Tell us your requirement and we come back with what is actually available.

DISCUSS SITE REQUIREMENTS

Where we are focused

Three markets, three different power stories

Each market has its own power, permitting and delivery profile, and that is usually what decides a timeline. The sites published below sit inside these markets.

United States

Texas, Georgia — grid-adjacent, fastest energization

Sourcing
Energy profile
Grid-adjacent capacity with the shortest route to power
Site capacity range
2–20 MW

Europe

Nordics, Iberia — hydro and wind, longer permitting

Sourcing
Energy profile
Hydro and wind, with longer permitting timelines
Site capacity range
2–20 MW

United Arab Emirates

Abu Dhabi, Dubai — sovereign capacity, high density

Opening
Energy profile
Sovereign capacity built for high-density deployment
Site capacity range
2–20 MW

Loading live site availability

How it works

From parcel to assessment in four steps

The request takes about five minutes and costs nothing. Nothing commits you to develop.

  1. Share your site

    Location, parcel size and whether a grid interconnection agreement is already in place.

  2. Confirm power

    Available megawatts, substation status and how long until power can actually be delivered.

  3. Set the energy mix

    Grid, renewable or hybrid supply, plus any PPA. This drives the ESG score and carbon figure.

  4. Get your assessment

    An ESG grade, estimated annual revenue and concrete next steps — at no cost, with no obligation.

Use cases

Who this is for

Three different problems, one set of site data.

Land owners

Find out what your parcel is worth

Before spending on feasibility consultants, get an indicative valuation based on power, land and energy profile.

  • Assessment at no cost
  • No development commitment
  • Reply within one business day
Developers

De-risk site selection

Compare candidate sites on the criteria that actually gate a data centre: megawatts, lead time and cooling viability.

  • Substation capacity data
  • Energization timelines
  • Cooling suitability
Operators

Move into a ready site

Skip greenfield entirely and take space at a location where power is already secured and energized.

  • Sites in our priority markets
  • Tier I–IV development
  • Direct-to-chip cooling
FAQ

Questions land owners ask

What does 'energization' mean?

The date power can actually be delivered to the site. It is the constraint that most often decides a data centre timeline, which is why it is listed on every site card.

Do I need a PPA already in place?

No. A Power Purchase Agreement improves your ESG score and reduces residual emissions, but the assessment works either way and will show you the difference.

What is a Core versus Expansion node?

Core nodes are fully energized and operating today. Expansion nodes are contracted and under construction. Edge nodes serve latency-sensitive workloads closer to users.

How is the ESG score calculated?

From your energy mix, PPA status and available capacity. The letter grade, carbon footprint in tCO2e per year and renewable ratio update live as you change inputs during the assessment.

Is the assessment binding?

No. It is a feasibility indication at no cost. Nothing commits you to develop, lease or sell.

Talk to the site team

Tell us about your parcel and we'll come back with an indicative view.

What are you interested in? * (required)

We reply within one business day. No marketing lists. By sending this you agree we may contact you about your enquiry — see our privacy notice.

Find out what your land is worth

No cost, no obligation, and we reply within one business day.